To see SVG image, Please use a modern browser!

Crown

T 0.00° Table  
A 59.42° 03-21-27-45-51-69-75-93 Establish girdle thickness.
B 55.47° 12-36-60-84 Level the girdle.
C 43.34° 96-24-48-72 Meet at A & B.
D 40.00° 96-24-48-72 Meet at A & B.
E 41.13° 12-36-60-84 Meet at A.
F 34.13° 96-24-48-72 Cut to same height as D.
G 34.13° 12-36-60-84 Meet at D & E.
G1 90.00° 12-36-60-84 Cut to desired stone size at P3 & P4.
G2 90.00° 03-21-27-45-51-69-75-93 Cut to level girdle at P3 meet point.

Pavilion

1 42.00° 96-24-48-72 Cut to culet centerpoint.
2 46.06° 04-20-28-44-52-68-76-92 Cut to a meet point well below the Culet tip.
3 45.05° 12-36-60-84 Cut to P2 meet point.
4 50.53° 03-21-27-45-51-69-75-93 Cut to P1 & P3 meet points.